Figure 42: Placing The Bumper Foot On A Base Corner Hole; Figure 43: Inserting The Rivet Into The Bumper Foot - Allied Telesis 950 Series Installation Manual

Advanced layer 3+ stand-alone switches
Table of Contents

Advertisement

3. Place the bumper foot onto one of the holes in the base of the switch.
Refer to Figure 42.
Figure 42. Placing the Bumper Foot on a Base Corner Hole
4. Insert the rivet to secure the bumper foot to the base. Refer to
Figure 43.
Figure 43. Inserting the Rivet into the Bumper Foot
5. Repeat steps 2 to 4 to install the remaining bumper feet.
6. Turn the switch over and place it on a flat, secure desk or table, leaving
ample space around it for ventilation.
x950 Series Installation Guide for Stand-alone Switches
83

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x950-28xsqAt-x950-28xtqm

Table of Contents