Beginning The Installation; Required Items; Switch Orientations In The Equipment Rack; Figure 61: Bracket Holes On The Switch - Allied Telesis AlliedWare Plus x950 Series Installation Manual

Advanced layer 3+, ethernet line card, ac power supply, fan module
Table of Contents

Advertisement

Chapter 6: Installing the Switch in an Equipment Rack

Beginning the Installation

Required Items

Switch
Orientations in
the Equipment
Rack
110
This chapter contains the procedure for installing the switch in a standard
19-inch equipment rack, with the brackets included with the unit.
The following items are required to install the switch in an equipment rack:
Two equipment rack brackets (included with the switch)
Eight M4x6mm bracket screws (included with the switch)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
The switch has two sets of screw holes on the left and right sides, for the
standard brackets included with the switch and the optional AT-RKMT-
SL01 Sliding Rack Mount Kit. Figure 61 identifies the holes for the
standard brackets.
Holes for
Standard Brackets
Figure 61. Bracket Holes on the Switch
You can install the switch with its front panel flush with or extending in
front of the equipment rack. The illustrations in Figure 62 on page 111
show the possible switch orientations in the equipment rack.
Holes for
Standard Brackets

Advertisement

Table of Contents
loading

Table of Contents