Installing The Switch On The Plywood Base; Figure 71: Installing The Brackets To The Switch For Wall Installation - Allied Telesis AlliedWare Plus x950 Series Installation Manual

Advanced layer 3+, ethernet line card, ac power supply, fan module
Table of Contents

Advertisement

Chapter 7: Installing the Switch on a Wall

Installing the Switch on the Plywood Base

126
This procedure assumes that the plywood base for the switch is already
installed on the wall. Please review "Reviewing Safety Precautions" on
page 78 and "Choosing a Site for the Chassis" on page 84 before
performing this procedure. Allied Telesis recommends a minimum of three
people for this procedure.
Warning
The device is heavy. Always ask for assistance before moving or
lifting it to avoid injuring yourself or damaging the equipment.
Warning
The device should be installed on the wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment may result if it is not properly fastened to the wall. 
E105
Allied Telesis recommends installing the power supplies and optional
XEM2 Line Card before installing the switch on a wall. For instructions,
refer to "Installing AT-PWR600 AC Power Supplies" on page 96 and
"Installing an Optional XEM2 Ethernet Line Card" on page 100.
To install the switch on the plywood base, perform the following
procedure:
1. Place the switch in a table.
2. Install the four brackets with the sixteen screws that come with the
switch to the sides of the unit, as shown in Figure 71.
Figure 71. Installing the Brackets to the Switch for Wall Installation

Advertisement

Table of Contents
loading

Table of Contents