Figure 58: Placing The Bumper Foot On A Base Corner Hole; Figure 59: Inserting The Rivet Into The Bumper Foot - Allied Telesis AT-x950-28XSQ Installation Manual

Virtual chassis stacking. advanced layer 3+ switch
Hide thumbs Also See for AT-x950-28XSQ:
Table of Contents

Advertisement

3. Place the bumper foot onto one of the holes in the base of the switch.
Refer to Figure 58.
Figure 58. Placing the Bumper Foot on a Base Corner Hole
4. Insert the rivet to secure the bumper foot to the base. Refer to
Figure 59.
Figure 59. Inserting the Rivet into the Bumper Foot
5. Repeat steps 2 to 4 to install the remaining bumper feet.
6. Turn the switch over and place it on a flat, secure desk or table, leaving
ample space around it for ventilation.
7. Do one of the following:
To install power supplies, go to "Installing PWR600 AC Power
AT-x950-28XSQ Switch and VCStack Installation Guide
93

Advertisement

Table of Contents
loading

Table of Contents