Operation; Ez Control Station - Goldacres Crop Cruiser G6 Operator's Manual

Table of Contents

Advertisement

OPERATION

EZ Control Station

7
6
9
10
NO.
FEATURE
1.
Main tank rinse (external water)
2.
Main tank rinse (recirculate)
3.
Main tank agitation
4.
Rinse tank fill (external water)
5.
Three way ball valve handle
6.
Spray pump switch
7.
Rinse tank switch
8.
Hydraulic fill pump switch (optional)
9.
Wash down gun switch
G4.7, G5, G6 Crop Cruiser Operator's Manual MY19 - REV 0
1
4
8
11
17
12
Chapter 8
3
2
5
13
14
16
18
NO.
FEATURE
10.
RPM raise switch
11.
Pod light switch
12.
Main tank fill ball valve
13.
Rinse tank drain (G5 only)
14.
Chemical probe venturi
15.
Main tank 3" fill point (direct to tank)
16.
Main tank 3" fill point (hydraulic pump)
17.
Micromatic rinse socket (optional)
18.
Chemical probe pump
15
Chapter 8 - Operation - 71

Advertisement

Table of Contents
loading

Table of Contents