Splitting A Peak; Merging Two Peaks - PerkinElmer LabChip GX User Manual

Table of Contents

Advertisement

Splitting a Peak

If two poorly resolved peaks have been identified as a single peak,
you can split the single peak into two separate peaks.
1
2
3

Merging Two Peaks

If the analysis has defined two separate peaks, the two distinct
adjacent peaks can now be merged into one peak. This will include
the area of both peaks in the total concentration and %purity
calculations.
To merge two adjacent peaks:
1
2
3
V4.2
In the
Graph
View, zoom in as necessary to view the single
peak.
Position the cursor inside the peak at the horizontal location
where you want to split the peak. (The Split Peak option is not
available if the cursor is an up arrow. Move the cursor until the
peak is not selected.)
Figure 29. Splitting a Peak
Right-click on the graph and select Split Peak on the shortcut
menu. A new Manual Peak is created abutting the original peak.
Exclude one of the peaks from the analysis, following the
procedure
"Excluding a Peak" on page
Verify that Show Peak Baselines is selected in the
Properties.
Click and drag the baseline of the remaining peak to include the
area under the excluded peak.
LabChip GX User Manual
Data Analysis
74.
Graph View
PerkinElmer
75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Labchip gx ii

Table of Contents