Domain Bridge Message Passing Tests - Honeywell Gent Viglion EN54 Generic Commissioning Instructions

For the fire alarm systems
Table of Contents

Advertisement

Domain bridge message passing tests

To check the domain bridge connections and to ensure messages can be passed between networks the following must be done.
Trigger an event in a network, such as a fault.
¨
Check the event is passed on to the connecting networks and is displayed at the networked control panels.
¨
Repeat the test at each network to establish message passing between networks.
¨
Finally back up the cards of the panel including the Network card and IO card to the Memory card. This ensures the
panels of each network knows the location of network controller, ie the domain bridge connection point.
4188-856_i2_12/06_Generic Vigilon (Compact + VA) Comms.
Vigilon (EN & BS) Compact (VA) panels
77

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gent viglion compact voice alarmGent viglion compactGent viglion bs

Table of Contents