Install Slide Entrance Assembly - KidKraft Cedar Summit COPPER RIDGE PLAYSET Installation And Operating Instructions Manual

Table of Contents

Advertisement

Step 24: Install Slide Entrance Assembly
Part 1
A: With a helper, lift the slide entrance assembly into place so that the (226) Crowsnest Side Joists are flush with the
top of the center board in the (060) End Panel. (fig.24.1 & 24.2).
B: Attach assembly to the fort using 2 (S2) #8 x 1-1/2" Wood Screws in the (231) Crowsnest Bottom Side Back and 2
(S2) #8 x 1-1/2" Wood Screws in the (233) Crowsnest Bottom Side Front. (fig.24.1 & 24.2).
C: Double check to make sure that (226) Crowsnest Side Joists are level with the panel and install 4 (S3) #8 x 2-1/2"
Wood Screws from the inside of the fort as shown in (fig.24.1 & 24.2).
D: From outside the fort install 2 (S3) #8 x 2-1/2" Wood Screws into the side of (227) Crowsnest Gusset Front and
from inside the fort install 2 (S3) #8 x 2-1/2" Wood Screws in the pre-drilled holes to secure (228) Crowsnest Gusset
Back. (fig.24.1 & 24.2).
Fig. 24.1
231
S2
x 2
233
End
Panel
4 x
8 x
Fig. 24.2
S2
x 2
226
S3
Hardware
#8 x 1-1/2" Wood Screw
S2
43
#8 x 2-1/2" Wood Screw
S3
57
227
226
228
S3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents