Floor Assembly - KidKraft Cedar Summit COPPER RIDGE PLAYSET Installation And Operating Instructions Manual

Table of Contents

Advertisement

Step 11: Floor Assembly
Part 1
A: Place 1 (111) Floor Board tight to (060) End Panel and 1 tight to (071) SW Wall Panel then attach each to the
(082) Side Joists with 4 (S20) #8 x 1-3/8" Wood Screws per board. (fig. 11.1, 11.2 and 11.3)
B: Place (112) Long Floor Joist tight to the bottom of each (111) Floor Board, centred over the pilot holes on the
(060)End Panel and (071) SW Wall Panel then attach with 2 (S4) #8 x 3" Wood Screws per panel. Attach (111)
Floor Board to (112) Long Floor Joist with 2 (S20) #8 x 1-3/8" Wood Screws per board. (fig. 11.1, 11.2 and 11.4)
Fig. 11.2
Top View
Fig. 11.3
Wood Parts
2 x
Floor Board 5/8 x 4-1/2 x 35-5/8"
111
1 x
Long Floor Joist 1-1/4 x 3 x 63-1/4"
112
112
111
S20
x 6 per board
112
111
13
Fig. 11.1
060
13
Tight
Hardware
13
12 x
#8 x 1-3/8" Wood Screw
S20
4 x
#8 x 3" Wood Screw
S4
33
Fig. 11.4
x 2 per
S4
060
side
071
111
112

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents