KidKraft Cedar Summit COPPER RIDGE PLAYSET Installation And Operating Instructions Manual page 108

Table of Contents

Advertisement

Step 61: Attach Steel Hand Grips to Fort
Part 2
B: B: Place EN71 Hand Rail so the top is flush to the inside edge of (073) Back Wall Panel and the bottom is
centred on (021) Left Access. Pre-drill holes using a 3/16" (4.8 mm) drill bit then attach EN71 Hand Rail using
2 (WL3) 1/4 x 1-3/8" Wafer Lags (with flat washer). (fig. 61.3, 61.4 and 61.5)
073
Fig. 61.4
EN71
Hand
Rail
Fig. 61.5
073
EN71
Hand
Rail
WL3
021
1/4" Flat
Flush
Washer
WL3
1/4" Flat
Washer
Flush
WL3
1/4" Flat
Washer
2 x
Fig. 61.3
Hardware
1/4 x 1-3/8" Wafer Lag
WL3
(1/4" flat washer)
108
A
Other Parts
1 x EN71 Hand Rail

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents