Attach Swings - KidKraft Cedar Summit COPPER RIDGE PLAYSET Installation And Operating Instructions Manual

Table of Contents

Advertisement

Step 62: Attach Swings
A: Using 1 Threaded Quick Link per rope, join 1 Swing Rope w/crimps to each side of the Swing Belt Seat.
Make sure to close the Threaded Quick Link tightly using an adjustable wrench. (fig. 62.1 and 62.2)
B: Using 1 Threaded Quick Link per rope, join the Acro Rope EN71 to the Acro Bar. Using another Threaded
Quick Link, attach the Acro Handle to the Acro Bar. Make sure to close the Threaded Quick Link tightly using an
adjustable wrench. (fig. 62.2 and 62.3)
C: Attach the other end of the swing and acro ropes to the Quick Links attached to the Swing Hangers. (fig. 62.1)
Fig. 62.1
Quick Link
Swing Belt Seat
Quick Link
Threaded Link
using adjustable
Acro
Rope
EN71
Swing Ropes
w/crimps
Caution: Threaded Quick Links must be
installed with the gate completely down
covering the threads and tighten as
instructed. (fig. 62.2)
Tighten
wrench
attach to Swing and
Fig. 62.2
Swing Belt Seat
Threaded Link
Acro ropes.
109
European customers
receive rope swing
instead of chain due
to EN71 standards:
To be installed as per
instructions.
Fig. 62.3
Acro Rope
EN71
Acro Bar
Threaded
Quick
Link
Acro Handles
Other Parts
1 x Acro Bar
2 x Acro Handle
2 x Swing Belt Seat
2 x Acro Rope EN71
4 x Swing Rope w/crimps
8 x Threaded Quick Link
Threaded
Quick
Link

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents