Chrysler PT Cruiser 2001 Service Manual Supplement page 1190

Table of Contents

Advertisement

PT
REMOVAL AND INSTALLATION (Continued)
(2) Remove shifter boot/bezel assembly from con-
sole by lifting up at mounting ring area (Fig. 9).
Fig. 9 Gearshift Boot Removal/Installation
1 – GEARSHIFT BOOT
INSTALLATION
(1) Position gearshift boot (Fig. 9) over the gear-
shift mechanism and engage tab on mount ring at
front to opening in console. Apply hand pressure to
engage bosses on mount ring of boot to console open-
ing slots.
(2) Position gearshift knob hole over the gearshift
mechanism (Fig. 8) and align the shift pattern.
(3) Strike knob with rubber mallet to engage knob
to mechanism.
(4) Verify that shift pattern is aligned properly.
GEARSHIFT CABLE ASSEMBLY
NOTE: The crossover and selector cables are man-
ufactured as a cable "assembly" and cannot be ser-
viced individually.
REMOVAL
(1) Pull up on gearshift knob with moderate force
to remove from gearshift mechanism (Fig. 10).
Fig. 10 Gearshift Knob Removal/Installation
1 – GEARSHIFT KNOB
(2) Remove shifter boot/bezel assembly from con-
sole by lifting up at mounting ring area (Fig. 11).
Fig. 11 Gearshift Boot Removal/Installation
1 – GEARSHIFT BOOT
TRANSAXLE
21 - 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents