Chapter 3 - Commissioning
Operation Verification – Base Station and
Micro Base Station
The following sections describe how to verify the correct functioning of
the Outdoor Units, Indoor Units, Ethernet connection and data
connectivity.
AU – ODU LEDs
To verify the correct operation of the AU – ODU, examine the LED
indicators located on the bottom panel of the outdoor unit.
The following tables list the provided LEDs and their associated
indications.
NOTE
Verifying the correct operation of the Outdoor Unit using the LEDs, as described below,
is only possible after the configuration of basic parameters has been completed.
Name
Description
PWR
Power indication
ALARM
Not Used
ETH
Downlink Ethernet status
indication
Base Station LEDs
To verify the correct operation of the Base Station equipment, examine
the LED indicators located on the front panels of the modules. The
following tables list the LEDs of the Base Station modules and their
associated indications.
3-4

Table 3-2: AU-ODU LEDs

Functionality
Off – ODU is not powered or 5V failed
Green – ODU power OK
Off – Ethernet Rx counter did not change
since last update
Green – Ethernet Rx counter changed
since last update
BreezeMAX System Manual