Download Print this page

Electrical Wiring - EBARA ESA500W Instruction Manual

Multi-stage dry vacuum pump, 200v/400v, 50hz, 200-220v/400-480v, 60hz

Advertisement

P.18

4.3 Electrical Wiring

Drawer of power cable
(Inside of control panel)
Power supply connector for accessory
Fig.4.4 Location of drawer of power cable, control connector, and earth bar
WARNING Be sure to keep the power supply to the pump turned off and
WARNING Electrical wiring shall be carried out only by qualified
CAUTION Do not apply the power supply from the pump's power pack to
PM10U
Earth Bar
lock-outed until you have finished the wiring and connecting
work. Also interrupt the Earth Leakage Breaker (ELB) during
this.
electricians.
any other equipment as this will result in malfunctioning of
the control units and in pump failure.
CN-Z CN-Y
Control signal receptacle
EBARA
CORPORATION

Hide quick links:

Advertisement

loading