Dell PowerConnect J-EX4200-24T Software Manual page 237

J series; j-ex series
Table of Contents

Advertisement

d. Synchronize the date and time settings of the switch with the management PC or
set them manually by selecting the appropriate option button. This is optional.
e. Click Next.
Use the Management Options page to select the management scenario:
7.
In-band Management—Use VLAN 'default' for management.
Select this option to configure all data interfaces as members of the default VLAN.
Click Next. Specify the management IP address and the default gateway for the
default VLAN.
In-band Management—Create new VLAN for management.
Select this option to create a management VLAN. Click Next. Specify the VLAN
name, VLAN ID, member interfaces, management IP address, and default gateway
for the new VLAN.
Out-of-band Management—Configure management port.
Select this option to configure only the management interface. Click Next. Specify
the IP address and default gateway for the management interface.
Click Next.
8.
On the Manage Access page, you may select options to enable Telnet, SSH, and SNMP
9.
services. For SNMP, you can configure the read community, location, and contact.
Click Next. The Summary screen displays the configured settings.
10.
Click Finish.
11.
The configuration is committed as the active switch configuration. You can now log in
with the CLI or the J-Web interface to continue configuring the switch.
If you use the J-Web interface to continue configuring the switch, the Web session is
redirected to the new management IP address. If the connection cannot be made, the
J-Web interface displays instructions for starting a J-Web session.
Related
Connecting and Configuring a J-EX Series Switch (CLI Procedure) on page 161
Documentation
Installing and Connecting a J-EX4200 Switch
NOTE: On J-EX8200 switches, only the out-of-band management option
is available.
NOTE: After the configuration is committed, the connectivity between the
PC and the switch might be lost. To renew the connection, release and renew
the IP address by executing the appropriate commands on the management
PC or by removing and reinserting the Ethernet cable.
Chapter 15: Initial Configuration
165

Advertisement

Table of Contents
loading

Table of Contents