Switch Simulation - BEAMEX MC5-IS User Manual

Nstrinsically safe multifunction calibrator
Hide thumbs Also See for MC5-IS:
Table of Contents

Advertisement

Switch Simulation

82
Advanced Operation and Configuration
Start the Switch Simulation as described in chapter Transmitter/
Switch Simulation on page 80. If the settings of the Basic Mode
windows suit Switch Simulation, a configuration window similar to
the lower left picture is shown.
26.04.2002 14:38
SWITCH SIMULATION
INPUT
Pressure
Port
P1:INT2C
Nominal Points
Actuating
50.000
Deactuating
40.000
OUTPUT
Voltage
Port
ET: V(gen)
Switch Limits
Actuated
5.0000
Deactuated
0.5000
Stop
Cancel
Field
Ramping
Select the Switch Type and enter the actuating point and the
deactuating point of the input signal. Also enter the output signal
levels for an actuated output and a deactuated output.
The upper right picture shows the Basic Mode window while Switch
Simulation is active. The second row of the upper window dis-
plays the active port and the actuating and deactuating points. The
second row of the lower window displays the actuated and
deactuated output of the switch.
Note.
To Zero a pressure module during Switch Simulation, press
MENU
Zero Pressure Module
D
7
/
and
/
Warning!
Remember to scale the output signal of the Switch Simulation
so that the instrument connected to the output signal loop is not
damaged.
1
P2: INT20C/ (50.00/40.00 kPa g)
kPa
kPa
SWITCH SIMULATION
2
ET: V(gen)/ (5.000/0.500 V)
V
V
Measurement V
Edit
Start
30.05.2002 10:32
INPUT
gauge
52.034
kPa
OUTPUT
5.0010
End
Pause
.
5.0011
MENU