Mitsubishi Electric GOT2000 Series Connection Manual page 96

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

3.3.2
RS-422 cable
■1. Connection diagram
(1) RS-422 connection diagram 2)
*1
■2. Precautions when preparing a cable
(1) Cable length
The length of the RS-422 cable must be 500m or less.
(2) GOT side connector
For the GOT side connector, refer to the following.
(3) HITACHI PLC side connector
Use the connector compatible with the HITACHI PLC side module.
For details, refer to the HITACHI PLC user's manual.
■3. Connecting terminating resistors
(1) GOT side
(a)
For GT27,GT25(Except GT2505-V), GT23
Set the terminating resistor setting switch of the GOT main unit to "Disable".
(b)
For GT2505-V
Set the terminating resistor selector to "330Ω".
For the procedure to set the terminating resistor, refer to the following.
3 - 6
3.3 Connection Diagram
GOT side
SDA
1
RDA
2
RSA
3
CSA
4
SG
5
SDB
6
RDB
7
RSB
8
CSB
9
Connect FG grounding to the appropriate part of a cable shield line.
1.4.1GOT connector specifications
1.4.3Terminating resistors of GOT
PLC side
RD-H
2
SD-H
3
-
6
ATT-H
7
SG
5
RD-L
1
SD-L
4
-
8
* 1
ATT-L
9

Advertisement

Table of Contents
loading

Table of Contents