Attach Power Cords; Power On The Server (Oracle Ilom) - Oracle SPARC T5-2 Service Manual

Hide thumbs Also See for SPARC T5-2:
Table of Contents

Advertisement

Attach Power Cords

Attach Power Cords
1.
Attach both power cords to the power supplies.
Note -
the server. Depending on how the firmware is configured, the server might boot at this time.
2.
Power on the server.
See
"Power On the Server (Oracle ILOM)" on page 172
Button)" on page
Related Information
"Power On the Server (Oracle ILOM)" on page 172
"Power On the Server (Power Button)" on page 173

Power On the Server (Oracle ILOM)

Before You Begin
Note -
by the top cover interlock switch, you must use the poweron command.
Type poweron at the Oracle ILOM prompt.
-> poweron
You will see an alert message on the system console. This message indicates that the server is
reset. You will also see a message indicating that the VCORE has been margined up to the value
specified in the default .scr file that was previously configured. For example:
-> start /System
Related Information
"Power On the Server (Power Button)" on page 173
172
SPARC T5-2 Server Service Manual • February 2017
As soon as the power cords are connected to a power source, standby power is applied in
173.
If you are powering on the server following an emergency shutdown that was triggered
or
"Power On the Server (Power

Advertisement

Table of Contents
loading

Table of Contents