Attach Power Cords; Power On The Server (Oracle Ilom) - Oracle SPARC T8-1 Service Manual

Hide thumbs Also See for SPARC T8-1:
Table of Contents

Advertisement

Related Information
"Remove the Server From the Rack" on page 52
"Attach Power Cords" on page 159

Attach Power Cords

1.
Attach both power cords to the power supplies.
As soon as the power cords are connected to a power source, standby power is applied in
Note -
the server. Depending on how the firmware is configured, the server might boot at this time.
2.
Power on the server.
See
"Power On the Server (Oracle ILOM)" on page 159
Power Button)" on page
Related Information
"Power On the Server (Oracle ILOM)" on page 159
"Power On the Server (System Power Button)" on page 160

Power On the Server (Oracle ILOM)

Type this command at the Oracle ILOM prompt.
-> start /System
You will see an alert message on the system console. This message indicates that the server is
reset.
Related Information
"Power On the Server (System Power Button)" on page 160
"Clear a Fault Manually" on page 37
160.
Attach Power Cords
or
"Power On the Server (System
Returning the Server to Operation
159

Advertisement

Table of Contents
loading

Table of Contents