7.
Reconnect the ribbon cable from the motherboard to the PS backplane (panel 3).
8.
Reinstall the air divider by sliding it into the chassis.
9.
Reinstall the memory risers.
See
"Install a DIMM and a Memory Riser" on page
10.
Push the power supplies all the way back into the chassis.
See
"Install a Power Supply" on page
Return the server to operation.
11.
a.
Install the top cover.
See
"Replace the Top Cover" on page
b.
Return the server to the normal operating position.
See
"Return the Server to the Normal Operating Position" on page
c.
Reinstall the power cords to the power supplies and power on the server.
See
"Returning the Server to Operation" on page
Related Information
"Remove the PS Backplane" on page 163
■
"Verify PS Backplane Functionality" on page 167
■
Verify PS Backplane Functionality
1.
Use the Oracle ILOM show faulty command to verify that the fault has been
cleared.
See
"Check for Faults" on page 46
Perform one of the following tasks based on your verification results:
2.
If the previous steps did not clear the fault, see
■
for information about the tools and methods you can use to diagnose component faults.
If the previous steps indicate that no faults have been detected, then the component has been
■
replaced successfully. No further action is required.
106.
93.
169.
169.
for more information on using the show faulty command.
"Detecting and Managing Faults" on page 31
Verify PS Backplane Functionality
170.
Servicing the PS Backplane
167