Connect Other Data Cables; Prepare The Power Cords - Oracle Sun SPARC T3-2 Installation Manual

Table of Contents

Advertisement

▼ Connect Other Data Cables

If your server configuration includes optional PCIe cards, connect the appropriate
I/O cables to their connectors.
If your server configuration includes optional PCIe cards, connect the
appropriate I/O cables to their connectors.
Refer to the PCIe card documentation for specific instructions.
Related Information
The PCIe card documentation
SPARC T3-2 Server Service Manual

▼ Prepare the Power Cords

Prepare the power cords by routing them from the AC power source to the server.
Caution – Do not attach power cables to the power supplies until you have
connected the server to a serial terminal or a terminal emulator (PC or workstation).
Note – The server goes into Standby mode and the ILOM service processor
initializes as soon as a power cable connects a power supply to an external power
source. System messages might be lost after 60 seconds if a terminal or terminal
emulator is not connected to the SER MGT port before power is applied.
Note – ILOM will signal a fault if both power supplies are not cabled at the same
time, since it will be a nonredundant condition.
1. Ensure that the circuit breakers are off on the AC power source.
Refer to the AC power source documentation for instructions.
2. Route the power cords from the AC power source to the rear of the server.
Do not attach the power cords to the power supplies at this time.
46
SPARC T3-2 Server Installation Guide • March 2012

Advertisement

Table of Contents
loading

Table of Contents