Strongarmpark Dc Installer Checklist - HySecurity StrongArmPark DC Programming And Operations Manual

With hysecurity smart dc controller mx3650-01 revision d
Hide thumbs Also See for StrongArmPark DC:
Table of Contents

Advertisement

StrongArmPark DC Installer CheckList

The following list provides a high level overview of the tasks involved in installing the StrongArmPark DC gate
operator. Take a moment to review the list and check off the items as you complete the install.
‰ Site Prep - concrete pad location/dimensions. Use template printed on the side of the sipping box.
‰ Make sure gate installation complies with ASTM F2200 Standard Specification for Automated Vehicular
Gate Construction. And, install the supplied WARNING signs on both sides of the barrier arm and on
its chassis. Signs must be viewable by incoming and outgoing vehicular traffic.
‰ Check for compliance with local codes, site conditions, and NEC standards.
‰ Install gate operator - (on concrete pad use four ½ - 13 x 3.5in long concrete wedge anchors.)
‰ Connect AC Power.
‰ Connect red wire to DC Power Switch.
‰ Turn DC Power ON.
‰ Connect all accessory devices.
‰ Check the Smart DC Controller software version. If necessary, upload the latest version from
www.hysecurity.com. See Smart Touch Analyze and Retrieve Tool.
‰ Set the Close Timer (through the User Menu).
‰ Set barrier arm speed, if applicable (through Installer Menu). Refer to S.T.A.R.T. (Smart Touch Analyze
and Retrieve Tool) in the Reference section.
‰ Set the dynamic reversing sensitivity, if needed (through Installer Menu).
‰ Set Relay User 2 to 28 or 29 and BA to 1 (breakaway arm) in the Installer Menu.
‰ Configure changes through the Installer Menu depending on the accessory devices that you have
installed.
‰ Give a copy of the Important Safety Information and pertinent operator instructions to the end user.
Show the end user how to:
• Remove the barrier arm from the breakaway bracket.
• Turn the power off and on to demonstrate learn limits after DC/AC cycles.
• Adjust physical limit stops for barrier arm open and close positioning.
• Turn the DC power switch off, which disengages the motor, and manually lift the barrier arm open.
‰ Take photographs of the completed installation site and save it in your business files.
www.hysecurity.com
© 2017
Introduction
MX3650-01 Rev. D
v

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents