Quantum DXi6900 User Manual page 282

With dxi 3.2.5 software
Hide thumbs Also See for DXi6900:
Table of Contents

Advertisement

Chapter 9: Configuration
Scheduler
Edit an Existing Event
To edit an existing event, double-click the event. If the event is recurring, select Open this 
l
occurrence to edit only the one instance of the event, or select Open the series to edit the
entire recurring series, and then click OK.
You cannot edit an event that occurred in the past.
l
You can also right-click an existing event to see options for editing an event.
l
Figure 175: Adding a New Event
2. Define the start and, if applicable, the end of the event.
Specify the Start Date and Start Time using the pop-up calendar and drop-down box.
l
(Replication throttle events only) Specify the End Date and End Time. The end date and time must
l
occur after the start date and time.
Note: For a new event, you can click and drag to adjust the start and end time. For an existing
event, you can drag the event to change when it occurs. You can also drag the left or right edge of
the event to adjust the start or end time.
3. Enter a brief description of the event in the Description box. (This description will display on the
schedule view.)
4. Specify options specific to the type of event. See the following sections:
Scheduling a Share or Partition for Replication on the next page
l
Scheduling Replication Throttling on page 284
l
Scheduling E-mail Reports on page 285
l
Quantum DXi6900 User's Guide
282

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents