Enroute; Reviewing Flight Plan Progress; Reviewing Afis Planned Leg Data - Honeywell GNS-XLS Operator's Manual

Flight management system
Table of Contents

Advertisement

4. FPL Date - VERIFY.
5. ENTER Key - DEPRESS.
NOTE: If an Active Flight Plan exists, the message REPLACE
ACTIVE FPL? appears. DEPRESS ENTER to replace the Active
Flight Plan with the AFIS Flight Plan.
6. ACTIVE FPL - CONFIRM. AFIS Flight Plan becomes the Active
Flight Plan. The initial leg must be established on the NAV Page
so the system can navigate normally.

ENROUTE

REVIEWING FLIGHT PLAN
PROGRESS
1. NAV Key - DEPRESS until
NAVIGATION Page 5,
Flight Plan Progress Page
appears. (Figure 7-41)
2. Current Leg Data - CON-
FIRM.
Observe AFIS
Planned data vs. Actual
GNS-X
calculated data.
LS
REVIEWING AFIS PLANNED
LEG DATA
3. Line
Select
DEPRESS to position cur-
sor over Leg Identifiers.
(Figure 7-42)
NOTE: ACTUAL data fields
become dashes, F REM field
becomes F REQ and ETA field
becomes ETE.
4. ENTER Key - DEPRESS to
review Planned data for
future legs of the Active
AFIS Flight Plan.
7-28
GNS-X
<
PRC:
F REM
FF P/E
ETA
TAS
GS
WIND
<
PRC: GUP
F REQ
FF P/E
ETE
Key
-
TAS
GS
WIND
<
DIR TO
F REQ
FF P/E
ETA
TAS
GS
WIND
Flight Management System AFIS Operation
LS
NAVIGATION 5/5
GUP
FL410
PLAN
9642
1832
02:09
02:08
488
507
300/ 26
310/ 38
Figure 7-41
NAVIGATION 5/5
FL410
PLAN
1330
------
1832
0+22
-----
488
507
300/ 26
---/---
Figure 7-42
NAVIGATION 5/5
ICT
FL---
PLAN
------
----
-----
03:17
---
---
---/---
310/ 38
Figure 7-43
ACT
9685
1800
485
519
ACT
----
---
---
ACT
9475
1800
485
491
Rev. 3
Sep/96

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents