Suzuki GRAND VITARA XL-7 Owner's Manual page 316

Hide thumbs Also See for GRAND VITARA XL-7:
Table of Contents

Advertisement

3) Tighten bolts and nuts fastening cylinder block and transmis-
sion to specified torque.
Tightening torque
Transmission to cylinder block bolt and nut (b) :
85 N·m (8.5 kg-m, 61.5 lb-ft)
1. Bolt (short)
2. Bolt (Long)
4) Remove lifting device
5) Tighten torque converter bolts to specified torque (for A/T
vehicle).
Tightening torque
Torque converter bolt (c) :
65 N·m (6.5 kg-m, 47.0 lb-ft)
6) Tighten bolts and nuts of exhaust No.1 pipe (1) to specified
torque.
Tightening torque
Exhaust No.1 pipe bolt and nut (d) :
50 N·m (5.0 kg-m, 36.5 lb-ft)
7) Install front differential housing with differential to chassis if
removed. Refer to "REMOUNTING" in Section 7E.
8) Install steering shaft lower assembly. Refer to "STEERING
LOWER SHAFT ASSEMBLY" in Section 3C1.
9) Install A/C compressor assembly. Refer to "COMPRESSOR
ASSEMBLY" in Section 1B.
10) Install P/S pump assembly. Refer to "POWER STEERING
PUMP" in Section 3B1.
11) Connect hoses, cables and electric wires.
12) Adjust accelerator cable play and A/T throttle cable play (for
A/T vehicle). Refer to "ACCELERATOR CABLE ADJUST-
MENT" and "A/T THROTTLE CABLE ADJUSTMENT (A/T
VEHICLE)" in Section 6E2.
13) Refill engine with engine oil referring to "ENGINE OIL
CHANGE" in Section 0B.
14) Refill cooling system, referring to "COOLING SYSTEM
FLUSH AND REFILL" in Section 6B.
15) Check to ensure that all fasteners and clamps are tightened.
16) Upon completion of installation, verify that there is no fuel
leakage, coolant leakage, P/S fluid leakage or exhaust gas
leakage at each connection.
ENGINE MECHANICAL (H27 ENGINE) 6A2-29

Advertisement

Table of Contents
loading

Table of Contents