Suzuki GRAND VITARA XL-7 Owner's Manual page 298

Hide thumbs Also See for GRAND VITARA XL-7:
Table of Contents

Advertisement

INSTALLATION
1) Install new manifold gaskets to cylinder heads and No.1 pipe
gasket to exhaust No.1 pipe.
2) Install exhaust manifolds.
• Always install new bolts with pre-coated adhesive to the
locations with ✱ mark.
• Tighten both manifold nuts and bolts to specified torque.
Tightening torque
Exhaust manifold bolt and nut (a) :
30 N·m (3.0 kg-m, 21.5 lb-ft)
1. Left (No.1) exhaust manifold
2. Right (No.2) exhaust manifold
3) Install stabilizer bar if it was removed. Refer to "STABILIZER
BAR / BUSHINGS" in Section 3D.
4) Install exhaust manifold stiffeners (if removed).
5) Install exhaust No.1 pipe (1).
Tighten exhaust No.1 pipe bolts to specified torque.
Tightening torque
Exhaust No.1 pipe bolt (b) :
50 N·m (5.0 kg-m, 36.5 lb-ft)
2. Exhaust No. 2 pipe
6) Tighten exhaust No.1 pipe nuts to specified torque.
Tightening torque
Exhaust No.1 pipe nut (b) :
50 N·m (5.0 kg-m, 36-5 lb-ft)
1. Exhaust No.1 pipe
2. Exhaust manifold
A. Without WU-TWC
B. With WU-TWC
ENGINE MECHANICAL (H27 ENGINE) 6A2-11

Advertisement

Table of Contents
loading

Table of Contents