Honda 954 Service Manual page 136

Table of Contents

Advertisement

FUEL SYSTEM (Programmed Fuel Injection)
Disconnect the ECM connectors.
Connect the test harness t o the wire harness
connectors.
Measure the resistance at the test harness ter-
minals.
-
Connection: A17
B20
-
Standard: 9
15 Cl (20"C/68"F)
Check for continuity between the test harness
terminal and ground.
Connection: A17 - Ground
Standard:
No
continuity
5-28
(+)
Normal
Out of range
Open circuit in BlackWhite and/or P i n W e l l o w wire
Continuity
Short circuit in Pink/YeIlow wire
No continuity
Replace the ECM with a new one, and inspect it
again

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbr954rr 2002

Table of Contents