Before You Install The Spectrometer; When The Spectrometer Arrives; Before The Service Engineer Arrives; When The Service Engineer Arrives - PerkinElmer AAnalyst 700 User Manual

Tomic absorption spectrometer
Table of Contents

Advertisement

Before you install the spectrometer

When the spectrometer arrives

Check the exterior of the shipping crate for obvious signs of damage. If the
crate has been damaged, file a claim with the authorized carrier immediately
and inform your nearest PerkinElmer office.
Contact your local PerkinElmer office to arrange for the installation.

Before the service engineer arrives

You must prepare a suitable site for the spectrometer and any accessories.
See Chapter 6, Laboratory Requirements, and the guides for any accessories.
You must make sure that the fume ventilation system and the necessary gas
supply lines and regulators are installed.
Although you should not perform the initial installation yourself, we
recommend that you read the installation instructions to learn about the
spectrometer and its requirements before you start using it.
These instructions are also provided in case you need to alter any of the
connections or move the instrument.

When the service engineer arrives

The service engineer will remove the spectrometer from the crate and check
that all parts have been delivered. If anything is missing or damaged, the
service engineer will make sure that the respective parts are supplied.
The service engineer will remove the shipping locks, perform pre-installation
checks, install the spectrometer, and make sure that everything functions
correctly.
0993-5255
Spectrometer Installation
2-3

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for PerkinElmer AAnalyst 700

Table of Contents