Tag Function - Mitsubishi Electric GOT 1000 Series Manual

Graphic operation terminal
Hide thumbs Also See for GOT 1000 Series:
Table of Contents

Advertisement

(From the previous page)
Actions are executed.
Up to 10 actions can set for a job, and they are
executed in order.
• 5.1.6 SQL text transmission (Communication action)
• 5.1.7 Arithmetic processing function (Operation action)
• 5.1.8 Resource data send function (Resource data send action)
• 6.8 Job Settings - Actions
In Update/Insert actions, substitute or insert values are
committed to database.
The program in the application server computer is
executed after execution of the last action.
• 5.1.9 Program execution function
• 6.7.3 Setting items in Program execution
If a value was written to a tag component, it is written
to the device data of the PLC CPU.
Job execution is completed.
POINT
POINT
POINT
For the case where an error occurs during job execution, refer to the following:
5.3 (2) When an error occurs in job execution
5.1.3

Tag function

The tag function collects device data of the GOTs on the network in units of tags.
Assigning a database field to a tag component allows reading or writing of a database value or device data that is
specified by the tag component.
For the tag function setting, refer to the following:
6.5 Device Tag Settings
GOT
Device
GD1000
GD2000
GD2001
Is the [Execute
program after action.]
box checked?
Checked
End
Device tag name: Process1
Component name
Read
Work_No.
Parameter
Write
Executed in order
Not checked
Device
Data type
Single
GD1000
Double
GD2000
5.1 DB Interface Function
1
2
3
4
5
6
7
8
5 - 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents