Job Execute Log - Mitsubishi Electric GOT 1000 Series Manual

Graphic operation terminal
Hide thumbs Also See for GOT 1000 Series:
Table of Contents

Advertisement

6.11.2

Job Execute Log

This area displays event log data of the jobs whose executions have been completed.
There are two kinds of Job Execute Log data: [Startup log] and [Detailed log], by which the job startup history and job
execution details can be checked respectively.
(1) Startup log
Startup log data of the jobs, each of which has [Startup logging] setting in [Job settings], are displayed.
6.7.1 (4) Startup logging
The following explains the display of the Startup log.
(a) Icon
The completion status of the job is displayed as an icon in the Job Execute Log area.
The following explains the status of each icon.
(b) Date
The date and time of job startup is displayed.
(c) Job name
Started jobs are displayed.
(d) Summary
Trigger instructions are displayed.
Start
Handshake start
Handshake end
6 - 94
6.11 Working Log
Icon
The job was completed normally. (No detailed log)
The job was completed normally. (With detailed log)
Selecting the job and clicking the
box.
The job was canceled. (No detailed log)
The job was canceled. (With detailed log)
Selecting the job and clicking the
box.
Display
Shows that any job other than handshake operation was activated.
Shows that job execution of handshake operation was activated.
Shows that job execution of handshake operation was completed.
Description
button displays the [View details] dialog
View details
button displays the [View details] dialog
View details
Description

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents