Job execution procedure

The following is the job execution procedure.
Is the GOT working?
Is the job enabled?
Job execution starts when trigger conditions are met.
• 5.1.4 Trigger monitoring function
• 6.7.2 Setting items in Trigger conditions
When [Handshake operation] is selected for Trigger conditions,
tag component values are obtained again.
Is the [Execute
program before action.] box
The program in the application server computer is
executed before execution of the first action.
• 5.1.9 Program execution function
• 6.7.3 Setting items in Program execution
(To the next page)
5 - 2
5.1 DB Interface Function
Start
Working
Enabled
checked?
Checked
Stopped
No job is executed during the stop.
Activate the GOT.
• 6.10.1 Checking the MES Interface Function status
(Status)
• 6.10.2 Manipulating the MES Interface Function status
(Operation)
Disabled
The job is not executed when it is disabled.
Enable the job.
• 6.10.3 Changing the job status (Change job status)
Not checked