Mitsubishi Electric GOT 1000 Series Manual page 104

Graphic operation terminal
Hide thumbs Also See for GOT 1000 Series:
Table of Contents

Advertisement

(4) Time specification startup
(a) When the specified date, time and day of the week match the actual date, time and day of the week, the
condition changes from false to true, resulting in job startup.
(b) When [Time specification startup] is selected, the date, time, and day of the week must be set.
1) Year, Month, Day, Hour, and Minute
Directly enter the date and time.
Matching with the actual date and time is not checked for any field that remains blank.
Year (4 digits)
Month
Day
Hour
Minute
2) Day:
Specify a day of the week.
Check the checkbox of the day to be specified.
If no box is checked, it means "every day".
(Example) The following shows that the job is to be activated at 17:30 on Monday through Friday.
(Example) The following shows that the job is to be activated at 9:00 on the 1st day of every month.
POINT
POINT
POINT
If [Startup logging] is selected, each job startup can be confirmed with the time to the second in the startup log.
The startup log can be checked on the [Working log] tab.
6.11 Working Log
6 - 28
6.7 Job Settings
Item
0000 to 9999
1 to 12
1 to 31
0 to 23
0 to 59
Description

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents