Download  Print this page

Mitsubishi Electric GOT 1000 Series Manual Page 100

Graphic operation terminal.
Hide thumbs

Advertisement

(5) Test mode
(a) Set whether to operate the job in test mode or not.
Up to 4 jobs can be set to [Test mode].
When the [Test mode] box is checked, the test mode is activated, and execution details of the job can be
confirmed before operation.
Job execution can be confirmed in [Job Execute Log] on the [Working log] tab.
(b) When [Test mode] is selected
The following are performed in the test mode.
Operations other than the following are identical to the actual operations.
• Startup data are logged.
• Detailed data are logged.
• Data are not written to GOT devices.
• No data are written to the database.
6 - 24
6.7 Job Settings

Advertisement

Table of Contents

   Related Manuals for Mitsubishi Electric GOT 1000 Series

Comments to this Manuals

Symbols: 0
Latest comments: