Iveco daily euro 4 Repair Manual page 533

Mechanical electric/electronic
Table of Contents

Advertisement

D
E
4
AILY
URO
Assembly
Figure 15
Arrange tool 99370241 (4) on the press and position bearing
(3) and support (2) comprehensive of metal sheet guard on
the tool.
Put in half shaft (1) and, by the press (driving load
3300÷18000 N), put it into up to ledge.
NOTE
The bearing (3) must not be heated.
Figure 16
Mount the assembly on a vice.
Thread washer (2) and ring nut (1).
Using wrench 99355184 (3), tighten ring nut (1) at
prescribed torque.
Dent washer (2) on milled portion of ring nut (1) as indicated
in figure.
Print 603.93.651
Figure 17
Put assembled half shaft into rear axle box. Tighten screws
(1), securing half shaft to rear axle arm, at prescribed torque.
108040
Figure 18
Mount brake disk (2) on half shaft (3) and tighten securing
pin (1) at prescribed torque.
108041
21
REAR AXLE NDA RS
108042
107855
Base - March 2006

Advertisement

Table of Contents
loading

Table of Contents