Egr Heat Exchanger Removal - Refitting - Iveco daily euro 4 Repair Manual

Mechanical electric/electronic
Table of Contents

Advertisement

D
E
4
AILY
URO
Figure 34
Tighten the screw securing gear (1) to the intake valve
distributing shaft to the specified torque.
Figure 35
Make sure that chain (3) is subjected to tension in the length
included between gear (2) and gear (4).
Tighten the screw securing gear (2) to the exhaust valve
distributing shaft to the specified torque.
Remove tools 99360614 (1) and 99360615 (5, Figure 25).
Print 603.93.651
Re-attachment is carried out by reversing the order of
detachment operations. In particular, comply with the
following instructions:
- replace the seal rings, gaskets, safety snap rings and
high-pressure pipes with new parts;
- lubricate the seal rings with engine oil prior to assembling;
- tighten the screws, nuts and pipe fittings to the specified
torque values;
- check the engine oil level; top up, if necessary;
- fill the engine cooling system, start the engine, and check
for cooling fluid leaks.
88372
540730
EGR
MOVAL - REFITTING
Removal
Figure 36
88373
Remove plug (4) from expansion tank (3).
Arrange special container under the radiator, remove plug
located on radiator right side and drain engine coolant.
Remove oil filling plug (1) and take off sound deadening cover
(2).
Disconnect electrical connection (6) from pressure switch.
Loosen clamps and disconnect coolant vent tube (5).
Remove securing screws and disconnect tank (3) from wall.
Disconnect electrical connection (7) from the level sensor
placed under tank (3).
Loosen clamps and disconnect coolant tube (8) placed under
tank (3).
F1C ENGINE
HEAT
EXCHANGER
179
RE-
105027
Base - March 2006

Advertisement

Table of Contents
loading

Table of Contents