Completing The Installation - Lenovo x3530 M4 Installation And Service Manual

Hide thumbs Also See for x3530 M4:
Table of Contents

Advertisement

Figure 59. Signal cable installation
3. Use the cable clips on the chassis to secure the cables so that they do not get in the way or
get damaged.
If you have other devices to install or remove, do so now. Otherwise, go to "Completing the installation"
on page 73.

Completing the installation

Use this information to complete the installation.
To complete the installation, complete the following steps:
Step 1.
If you removed the air baffle, reinstall it (see "Replacing the air baffle" on page 74).
Step 2.
If you removed a PCIe riser-card assembly, reinstall it (see "Replacing a PCI riser-card assembly"
on page 74).
Step 3.
If you removed the server cover, replace it (see "Replacing the server top cover" on page 75).
Step 4.
Install the server in the rack cabinet (see the Rack Installation Instructions that come with the
server for instructions).
Step 5.
Reconnect the cables and power cords (see "Connecting the cables" on page 76).
Step 6.
Start the server. Confirm that is starts correctly and recognizes the newly installed devices, and
make sure that no error LEDs are lit.
Step 7.
Update the server configuration (see "Updating the server configuration" on page 77).
.
Chapter 2
Installing optional devices
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

System x3530 m47160

Table of Contents