Engine Installation - Toyota 1 MZ–FE Manual

Table of Contents

Advertisement

81
1MZ–FE ENGINE
ENGINE MECHANICAL

ENGINE INSTALLATION

(See Components for Engine Removal and Installation)
1. INSTALL FRONT EXHAUST PIPE STAY
Install the pipe stay with the 2 bolts.
Torque: 21 N–m (210 kgf–cm, 16 ft–lbf)
2. INSTALL RR ENGINE MOUNTING INSULATOR
Install the mounting insulator with the 4 bolts.
Torque:63.7 N–m (650 kgf–cm, 47 ft–lbf)
3. INSTALL FR ENGINE MOUNTING INSULATOR
Install the mounting insulator with the 4 bolts.
Torque: 6.74 N–m (650 kgf–cm, 47 ft–lbf)
4. INSTALL ENGINE AND TRANSAXLE ASSEMBLY IN
VEHICLE
(a) Attach the engine sling device to the engine hangers.
(b) Lower the engine into the engine compartment.
Tilt the transaxle downward, lower the engine and
clear the LH mounting.
NOTICE: Be careful not to hit the PS gear housing or
neutral start switch.
(c) Keep the engine level, and align RH and LH mountings
with the body bracket.
EG2–181

Advertisement

Table of Contents
loading

Table of Contents