1MZ–FE ENGINE
–
ENGINE MECHANICAL
(e) Install 2 new gaskets and EGR pipe with the 4 nuts.
Torque: 12 N–m (120 kgf–cm. 9 ft–lbf)
(f) install the No. 1 engine hanger with the 2 bolts.
Torque: 39 N–m (400 kgf–cm, 19 ft–lbf)
(g) Install the air intake chamber stay with the 2 bolts.
Torque: 19.5 N–m (200 kgf–cm, 14 ft–lbf)
(h) Connect the 2 PS air hoses.
(i) Connect the PS pressure tube with the 2 nuts.
(j) Connect the RH oxygen sensor connector clamp to
the PS pressure tube.
(k) Connect the ground strap with the bolt.
(1) Connect the hydraulic pressure pipe to the air intake
chamber with the bolt.
EG2–27