1MZ–FE ENGINE
–
ENGINE MECHANICAL
(b) Connect the 2 knock sensor connectors.
(c) Install the wire band.
(d) Connect the engine wire clamp.
14. INSTALL NO.2 IDLER PULLEY BRACKET
Install the pulley bracket with the 2 bolts.
Torque: 28 N–m (290 kgf–cm, 21 ft–lbf)
15. INSTALL A/C COMPRESSOR HOUSING BRACKET
Install the compressor housing bracket with the 3
bolts.
Torque: 25 N–m (250 kgf–cm. 18 ft–lbf)
16. INSTALL GENERATOR BRACKET AND ADJUSTING
BAR
Install the generator bracket and adjusting bar with
the 3 nuts.
Torque: 43 N–m (440 kgf–cm, 32 ft–lbf)
17. INSTALL GENERATOR
Install the generator with the 2 bolts. Do not tighten
the bolts yet.
18. INSTALL CYLINDER HEAD
(See pages
EG2–96
19. INSTALL TIMING PULLEYS AND BELT
(See pages
EG2–49
20. REMOVE ENGINE STAND
to 118)
to 55)
EG2–177