Toyota 1 MZ–FE Manual page 184

Table of Contents

Advertisement

EG2–184
1MZ–FE ENGINE
ENGINE MECHANICAL
16. CONNECT PS PRESSURE TUBE
(a) Connect the PS pressure tube with the 2 nuts.
(b) Connect the 2 PS air hoses.
17. INSTALL DRIVE SHAFTS (See SA section)
18. INSTALL FRONT EXHAUST PIPE
(a) Temporarily install 3 new gaskets and the front ex–
haust pipe with the 2 bolts and 6 nuts.
(b) Tighten the 4 nuts holding the exhaust manifolds to
the front exhaust pipe.
Torque: 62 N–m (630 kgf–cm, 46 ft–lbf)
(c) Tighten the 2 bolts and 2 nuts holding the three–way
catalytic converter to the front exhaust pipe.
Torque: 56 N–m (570 kgf–cm, 41 ft–lbf)
(d) Connect the bracket with the 2 bolts.
Torque: 19 N–m (195 kgf–cm, 14 ft–lbf)
(e) Connect the front exhaust pipe clamp with the 2 bolts.
Torque: 29 N–m (300 kgf–cm, 22 ft–lbf)
19. INSTALL A/C COMPRESSOR
(a) Install the A/C compressor and drive belt adjusting
bar bracket with the 5 bolts.
Torque: 25 N–m (250 kgf–cm, 18 ft–lbf)

Advertisement

Table of Contents
loading

Table of Contents