Toyota 1 MZ–FE Manual page 389

Table of Contents

Advertisement

1MZ–FE ENGINE
LUBRICATION SYSTEM
(c) Install the No.2 oil pan with the 10 bolts and 2 nuts.
Torque: 8 N–m (80 kgf–cm, 69 in.–lbf)
6. INSTALL BOLTS HOLDING NO.1 OIL PAN TO
TRANSAXLE
Install the 2 bolts.
Torque: 37 N–m (380 kgf–cm, 27 ft–lbf)
7. INSTALL FLYWHEEL HOUSING UNDERCOVER
Install the undercover with the 2 bolts.
Torque: 7.8 N–m (80 kgf–cm, 69 in.–lbf)
8. INSTALL FRONT EXHAUST PIPE STAY
Install the pipe stay with the 2 bolts.
Torque: 21 N–m (210 kgf–cm, 15 ft–lbf)
9. INSTALL FRONT EXHAUST PIPE
(a) Temporarily install 3 new gaskets and the front ex–
haust pipe with the 2 bolts and6 nuts.
(b) Tighten the 4 nuts holding the exhaust manifolds to
the front exhaust pipe.
Torque: 62 N–m (630 kgf–cm, 46 ft–lbf)
(c) Tighten the 2 bolts and 2 nuts holding the three–way
catalytic converter to the front exhaust pipe.
Torque: 56 N–m (570 kgf–cm, 41 ft–lbf)
(d) Connect the bracket with the 2 bolts.
Torque: 19 N–m (195 kgf–cm, 14 ft–lbf)
EG2–389

Advertisement

Table of Contents
loading

Table of Contents