Copy Database - Multi Ecdis - Simrad Maris ECDIS900 Operator's Manual

Hide thumbs Also See for Maris ECDIS900:
Table of Contents

Advertisement

Copy database - multi ECDIS

The system will automatically update the charts that have a valid permit.
I
MPORTANT
If there are new edition charts on the update CD for which the user has valid permits, then
ECDIS offers to install the charts.
REMARKS
Information regarding the update process is displayed in the Messages area.
To check if ARCS charts are up to date, the date of the last update is displayed in the chart
handling dialogue.
NOTE
If a large number of charts are involved the process may take some time.
C
HECKING UPDATED OBJECTS ON THE CHART
To check what has been updated it is possible to switch temporarily between the display of
updated chart and original chart.
Select the option Display updated tiles borders in the Chart settings dialogue to
display the borders of updated tiles.
Press and hold B to display the base chart before updating.
Release the key to display the updated chart.
As it is for ENC charts, when ARCs chart installation and update is completed on one station,
ECDIS gives the possibility to copy the updated database over the network, from this station
to other stations. This transfer is optimized.
Proceed as follow:
Install and/or update ARCS database on the planning station
In Chart handling dialogue press the button "Copy database"
The list of remote PC running ECDIS and connected to the LAN is listed in the dialogue
Select the PC(s) on which the ARCS should be copied and press Copy Database.
On the remote station, ARCS are deactivated in case ARCS charts are used.
59
C
-
OPY DATABASE
MULTI
ECDIS

Advertisement

Table of Contents
loading

Table of Contents

Save PDF