Unpacking - Avaya IP500 V2 Installation Manual

Hide thumbs Also See for IP500 V2:
Table of Contents

Advertisement

4.3 Unpacking

Procedure
1. o Check for Packaging Damage
Before unpacking any equipment, check for any signs of damage that may have occurred during transit. If any
damage exists bring it to the attention of the carrier.
2. o Check the Correct Parts Have Been Delivered
Check all cartons against the packing slip and ensure that you have the correct items. Report any errors or
omissions to the equipment supplier.
3. o Retain All Packaging and Documentation
While unpacking the equipment, retain all the packaging material. Fault returns are accepted only if repackaged in
the original packaging. If performing a staged installation, the original packaging will also assist when repacking
equipment to be moved to the final install site.
4. o Ensure that Anti-Static Protection Measures are Observed
Ensure that anti-static protection measures are observed at all times when handling equipment with exposed
electrical circuit boards.
5. o Check All Parts
Visually inspect each item and check that all the necessary documentation and accessory items have been included.
Report any errors or omissions to the dealer who supplied the equipment.
6. o Check All Documentation
Ensure that you read and retain any documentation included with the equipment.
Installing IP500/IP500 V2
IP Office 9.0
Use the following procedure when unpacking any equipment supplied by
Avaya or an Avaya reseller or distributor.
Information Required
· o Equipment Checklist.
An installation checklist of the parts and equipment ordered for the
installation.
IP500 V2 Installation: Documentation
15-601042 Issue 28c (19 August 2013)
Page 77

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip500

Table of Contents