Ip500 Tools Required - Avaya IP500 V2 Installation Manual

Hide thumbs Also See for IP500 V2:
Table of Contents

Advertisement

9. IP500 Basic Installation

9.1 IP500 Tools Required

The following is a general summary of the tools required. Additional tools and equipment will be
required for wall and or rack mounting and to fashion ground cable connections suitable to local
requirements.
· Tools Required
· o 5mm Flat-blade screwdriver.
· o Crosshead screwdriver.
· o Anti-static wrist strap and ground point.
· o RJ45-RJ45 Ethernet LAN Cable.
· o M4 Cross-Head Screwdriver.
· o Tools suitable for crimping a cable spade.
· o If wall mounting, drills and tools for wall mounting fixtures.
· Additional Parts Required
In addition to orderable IP Office equipment, the following items will be required.
· o 14AWG Solid copper wire for ground connection of control units and expansion modules.
· o Cable sleeve matching local regulator requirements for ground wires. Typically green for a functional ground
and green/yellow for a protective ground.
· o If wall mounting, additional fixtures and fittings suitable for the wall type and mounting kit being used.
· o Cable ties and labels for tidying and identifying cables.
Installing IP500/IP500 V2
IP Office 9.0
15-601042 Issue 28c (19 August 2013)
Page 188

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip500

Table of Contents