J-series™ Services Router User Guide
Country
Italy
Japan
North America
United Kingdom
Figure 110: AC Plug Types
Australia
China
NOTE: Power cords and cables must not block access to router components or
drape where people might trip on them.
For information about the AC power supply, see "J2300 Power System" on page 15,
"J4300 Power System" on page 26, or "J6300 Power System" on page 26.
To connect the power cord during initial installation, see "Connecting
Power to the Services Router" on page 43.
To replace the AC power cord, see "Replacing a Power Supply Cord in
a J2300 or J4300 Router" on page 532 or "Replacing a Power Supply
Cord in a J6300 Router" on page 536.
Network Cable Specifications
The Services Router supports interfaces that use various kinds of network cable.
For information about the type of cable used by each interface, see "Network
Cable Specifications and Connector Pinouts" on page 551.
Site Preparation Checklist
The checklist in Table 205 summarizes the tasks you need to perform when
preparing a site for Services Router installation.
548
Site Preparation Checklist
Electrical Specifications
250 VAC, 10 A, 50 Hz
125 VAC, 12 A, 50 Hz or 60 Hz
125 VAC, 10 A, 60 Hz
250 VAC, 10 A, 50 Hz
Europe
Italy
Plug Standards
CEI 23–16/VII
JIS 8303
NEMA 5-15
BS 1363A
Japan
North America
UK