Site Preparation Checklist for EX4500 Switches

The checklist in
Table 21 on page 71
EX4500 switch installation.
Table 21: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches
you want to install.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the switch.
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables
summarizes the tasks you need to perform when preparing a site for
For More Information
"Environmental Requirements and Specifications for EX Series Switches"
on page 73
"AC Power Supply Specifications for EX4500 Switches" on page 61
"EX4500 Switches Hardware Overview" on page 20
"Rack Requirements" on page 79
"Cabinet Requirements" on page 80
"Clearance Requirements for Airflow and Hardware Maintenance for
EX4500 Switches" on page 81