Ex4500 Site Guidelines And Requirements - Juniper EX4500 Hardware Manual

Hide thumbs Also See for EX4500:
Table of Contents

Advertisement

Table 21: Site Preparation Checklist (continued)
Item or Task
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
RELATED DOCUMENTATION
Installing and Connecting an EX4500 Switch | 114

EX4500 Site Guidelines and Requirements

IN THIS SECTION
Environmental Requirements and Specifications for EX Series Switches | 73
General Site Guidelines | 78
Site Electrical Wiring Guidelines | 78
Rack Requirements | 79
Cabinet Requirements | 80
Clearance Requirements for Airflow and Hardware Maintenance for EX4500 Switches | 81
Grounding Cable and Lug Specifications for EX4500 Switches | 83
For More Information
72
Performed

Advertisement

Table of Contents
loading

Table of Contents