Site Preparation Checklist for EX4300 Switches

The checklist in
Table 16 on page 97
EX4300 switch installation.
Table 16: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
Measure the distance between external
power sources and the switch installation
site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches
you want to install.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the switch.
Plan rack or cabinet location, including
required space clearances.
summarizes the tasks you need to perform when preparing a site for
For More Information
Environmental Requirements and
Specifications for EX Series
Switches
AC Power Supply Specifications
for EX4300 Switches
DC Power Supply Specifications
for EX4300 Switches
"EX4300 Switches Hardware
Overview" on page 58
Rack Requirements
Cabinet Requirements
"Clearance Requirements for
Airflow and Hardware
Maintenance for EX4300
Switches" on page 126
Performed by
Date
97