Site Preparation Checklist for EX2300 Switches

The checklist in
Table 18 on page 53
for EX2300 switch installation.
Table 18: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
Measure the distance between external
power sources and the switch installation
site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches
you want to install.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the switch.
summarizes the tasks you need to perform when preparing a site
For More Information
"Environmental Requirements and Specifications
for EX Series Switches" on page 55
"Power Specifications for EX2300 Switches" on
page 47
"EX2300 Switches Hardware Overview" on page 2
"Rack Requirements" on page 63
"Cabinet Requirements" on page 65