IBM Multiprise 3000 S/390 Installation Manual page 53

Enterprise
Table of Contents

Advertisement

4 Power Switches
1. At each OCA insure that both the power
and the UEPO BYPASS switches are in the
normal position.
2. Repeat this step for each frame.
5 CBU Power switches
1. If installed insure that each CBU (Crypto
Battery Unit) switch is in the Enabled
position if installed. All models DO NOT
support CBU.
Note: The CBU's are located on each
OCA of the CPC frame.
2. Repeat this step for each CPC frame.
SVC
UEPO
BYPASS
NORM
SVC
PWR
NORM
Chapter 4. System Power-On
PWR OUT
PWR OUT
OCA FLT
OCA FLT
LOAD FLT
LOAD FLT
OT FLT
OT FLT
AMD FLT
AMD FLT
IBF FLT
IBF FLT
SVC
SVC
UEPO
UEPO
BYPASS
BYPASS
NORM
NORM
J4
J4
J3
J3
J2
J2
PWR IN
PWR IN
SVC
SVC
PWR
PWR
NORM
NORM
J1
J1
4-3

Advertisement

Table of Contents
loading

Table of Contents